±Recent Visitors

Recent Visitors to Com-Central!

±User Info-big


Welcome Anonymous

Nickname
Password

Membership:
Latest: cgsimpson
New Today: 0
New Yesterday: 0
Overall: 6645

People Online:
Members: 0
Visitors: 527
Total: 527
Who Is Where:
 Visitors:
01: Community Forums
02: Photo Gallery
03: Community Forums
04: CPGlang
05: Community Forums
06: CPGlang
07: Home
08: Community Forums
09: Community Forums
10: Community Forums
11: Photo Gallery
12: Community Forums
13: Downloads
14: Community Forums
15: Community Forums
16: Photo Gallery
17: Home
18: Community Forums
19: Community Forums
20: Community Forums
21: Home
22: Home
23: Community Forums
24: Downloads
25: Community Forums
26: CPGlang
27: Community Forums
28: Photo Gallery
29: Your Account
30: Community Forums
31: Community Forums
32: Community Forums
33: Community Forums
34: Community Forums
35: Statistics
36: Community Forums
37: Community Forums
38: Community Forums
39: Photo Gallery
40: Community Forums
41: Community Forums
42: Community Forums
43: Community Forums
44: Community Forums
45: Community Forums
46: Home
47: Photo Gallery
48: Community Forums
49: Community Forums
50: Home
51: Downloads
52: Community Forums
53: Community Forums
54: Community Forums
55: Community Forums
56: Downloads
57: Photo Gallery
58: Photo Gallery
59: Photo Gallery
60: Photo Gallery
61: Home
62: Community Forums
63: Community Forums
64: Home
65: Community Forums
66: Community Forums
67: Community Forums
68: Community Forums
69: Community Forums
70: Community Forums
71: Photo Gallery
72: Community Forums
73: Community Forums
74: Community Forums
75: Photo Gallery
76: Photo Gallery
77: Community Forums
78: Community Forums
79: Home
80: Community Forums
81: Community Forums
82: Community Forums
83: Community Forums
84: CPGlang
85: Community Forums
86: Community Forums
87: CPGlang
88: Community Forums
89: Community Forums
90: Community Forums
91: Statistics
92: Photo Gallery
93: Community Forums
94: Community Forums
95: Community Forums
96: Community Forums
97: Photo Gallery
98: Photo Gallery
99: Photo Gallery
100: Community Forums
101: Downloads
102: Community Forums
103: Community Forums
104: Community Forums
105: Downloads
106: CPGlang
107: Community Forums
108: Community Forums
109: Community Forums
110: Community Forums
111: Your Account
112: Community Forums
113: Photo Gallery
114: Community Forums
115: Photo Gallery
116: Community Forums
117: Community Forums
118: Community Forums
119: Community Forums
120: Photo Gallery
121: Photo Gallery
122: Community Forums
123: Community Forums
124: Downloads
125: Photo Gallery
126: Home
127: Community Forums
128: Community Forums
129: Community Forums
130: Photo Gallery
131: Photo Gallery
132: Community Forums
133: Photo Gallery
134: Community Forums
135: Community Forums
136: CPGlang
137: Downloads
138: Home
139: Community Forums
140: Community Forums
141: Photo Gallery
142: Community Forums
143: Community Forums
144: Community Forums
145: Community Forums
146: Community Forums
147: Photo Gallery
148: Community Forums
149: Community Forums
150: Photo Gallery
151: Community Forums
152: Community Forums
153: Community Forums
154: Photo Gallery
155: Home
156: Community Forums
157: Community Forums
158: Community Forums
159: News
160: Community Forums
161: Downloads
162: Photo Gallery
163: Community Forums
164: Community Forums
165: Photo Gallery
166: Community Forums
167: Photo Gallery
168: News Archive
169: Community Forums
170: Community Forums
171: Community Forums
172: Community Forums
173: Community Forums
174: Community Forums
175: Community Forums
176: Community Forums
177: Member Screenshots
178: Community Forums
179: Downloads
180: Member Screenshots
181: Downloads
182: Photo Gallery
183: Community Forums
184: Community Forums
185: Community Forums
186: Community Forums
187: Home
188: Downloads
189: CPGlang
190: Home
191: Community Forums
192: Community Forums
193: Community Forums
194: Community Forums
195: Community Forums
196: Community Forums
197: Community Forums
198: Community Forums
199: Home
200: Photo Gallery
201: Downloads
202: Community Forums
203: Community Forums
204: Photo Gallery
205: Community Forums
206: Community Forums
207: Community Forums
208: Home
209: Community Forums
210: Community Forums
211: Community Forums
212: Photo Gallery
213: Community Forums
214: Home
215: Downloads
216: Photo Gallery
217: Community Forums
218: Community Forums
219: Community Forums
220: Community Forums
221: Community Forums
222: Community Forums
223: Downloads
224: Photo Gallery
225: Downloads
226: Community Forums
227: Community Forums
228: Community Forums
229: Statistics
230: Community Forums
231: Photo Gallery
232: Community Forums
233: Home
234: Downloads
235: Member Screenshots
236: Member Screenshots
237: Member Screenshots
238: Photo Gallery
239: Community Forums
240: Community Forums
241: Community Forums
242: Community Forums
243: Home
244: Community Forums
245: Community Forums
246: Home
247: Community Forums
248: Community Forums
249: Home
250: Home
251: Photo Gallery
252: Home
253: Community Forums
254: Community Forums
255: Community Forums
256: Photo Gallery
257: Community Forums
258: Photo Gallery
259: Community Forums
260: Downloads
261: CPGlang
262: Community Forums
263: Photo Gallery
264: CPGlang
265: Your Account
266: Photo Gallery
267: Community Forums
268: CPGlang
269: Home
270: Community Forums
271: Community Forums
272: CPGlang
273: Community Forums
274: Photo Gallery
275: Community Forums
276: Home
277: Community Forums
278: Photo Gallery
279: Community Forums
280: Photo Gallery
281: Community Forums
282: Community Forums
283: Community Forums
284: Community Forums
285: Community Forums
286: Photo Gallery
287: Community Forums
288: Photo Gallery
289: Community Forums
290: Home
291: Community Forums
292: Your Account
293: Member Screenshots
294: Photo Gallery
295: Community Forums
296: Photo Gallery
297: Photo Gallery
298: Home
299: Community Forums
300: Community Forums
301: Member Screenshots
302: Community Forums
303: Home
304: Photo Gallery
305: Community Forums
306: Community Forums
307: Community Forums
308: Photo Gallery
309: Downloads
310: Photo Gallery
311: Community Forums
312: Community Forums
313: CPGlang
314: Photo Gallery
315: Community Forums
316: Community Forums
317: Community Forums
318: Community Forums
319: Community Forums
320: Home
321: Home
322: Your Account
323: Community Forums
324: Community Forums
325: Community Forums
326: Community Forums
327: Community Forums
328: Community Forums
329: Home
330: Photo Gallery
331: Community Forums
332: Community Forums
333: Community Forums
334: Community Forums
335: Community Forums
336: Community Forums
337: Community Forums
338: Community Forums
339: Community Forums
340: Community Forums
341: Community Forums
342: Photo Gallery
343: Community Forums
344: Community Forums
345: Community Forums
346: Photo Gallery
347: Community Forums
348: Community Forums
349: Photo Gallery
350: Community Forums
351: Community Forums
352: Community Forums
353: Photo Gallery
354: Community Forums
355: Community Forums
356: Member Screenshots
357: Photo Gallery
358: Photo Gallery
359: Community Forums
360: Community Forums
361: Community Forums
362: Community Forums
363: Photo Gallery
364: Community Forums
365: Community Forums
366: Community Forums
367: Community Forums
368: Community Forums
369: Community Forums
370: Statistics
371: Community Forums
372: Community Forums
373: Community Forums
374: CPGlang
375: Community Forums
376: Community Forums
377: Community Forums
378: Community Forums
379: Community Forums
380: Photo Gallery
381: Home
382: Community Forums
383: Community Forums
384: Community Forums
385: Photo Gallery
386: CPGlang
387: Community Forums
388: Community Forums
389: Your Account
390: Community Forums
391: Community Forums
392: Community Forums
393: Photo Gallery
394: Downloads
395: Community Forums
396: Community Forums
397: Community Forums
398: Photo Gallery
399: Photo Gallery
400: Your Account
401: Photo Gallery
402: Community Forums
403: Photo Gallery
404: Community Forums
405: Photo Gallery
406: Community Forums
407: Home
408: Community Forums
409: Photo Gallery
410: Community Forums
411: Community Forums
412: Statistics
413: Community Forums
414: Community Forums
415: Photo Gallery
416: Community Forums
417: Community Forums
418: Community Forums
419: Community Forums
420: Community Forums
421: Community Forums
422: Community Forums
423: Community Forums
424: CPGlang
425: Community Forums
426: Home
427: Photo Gallery
428: Photo Gallery
429: Community Forums
430: Community Forums
431: Downloads
432: Community Forums
433: Community Forums
434: Community Forums
435: Photo Gallery
436: Community Forums
437: Community Forums
438: Community Forums
439: Community Forums
440: Photo Gallery
441: Home
442: CPGlang
443: Community Forums
444: Community Forums
445: Community Forums
446: Community Forums
447: News Archive
448: Downloads
449: Photo Gallery
450: Community Forums
451: Community Forums
452: Home
453: Community Forums
454: Photo Gallery
455: Community Forums
456: Home
457: Photo Gallery
458: Community Forums
459: Community Forums
460: Community Forums
461: Community Forums
462: CPGlang
463: Member Screenshots
464: Downloads
465: Community Forums
466: Home
467: Community Forums
468: Photo Gallery
469: Photo Gallery
470: Home
471: Your Account
472: Community Forums
473: Community Forums
474: Photo Gallery
475: Photo Gallery
476: Community Forums
477: Photo Gallery
478: Community Forums
479: Community Forums
480: Community Forums
481: Community Forums
482: Statistics
483: Photo Gallery
484: Home
485: Community Forums
486: Community Forums
487: Community Forums
488: Your Account
489: Community Forums
490: Community Forums
491: Community Forums
492: Photo Gallery
493: Community Forums
494: Community Forums
495: CPGlang
496: Community Forums
497: Community Forums
498: Community Forums
499: Community Forums
500: Community Forums
501: Photo Gallery
502: Photo Gallery
503: Photo Gallery
504: Home
505: Photo Gallery
506: Home
507: Tell a Friend
508: Community Forums
509: Statistics
510: Community Forums
511: Community Forums
512: Photo Gallery
513: CPGlang
514: Member Screenshots
515: Photo Gallery
516: Photo Gallery
517: Home
518: Photo Gallery
519: Community Forums
520: Photo Gallery
521: Community Forums
522: Community Forums
523: Downloads
524: Community Forums
525: Home
526: Home
527: News

Staff Online:

No staff members are online!
Army Takes Delivery of Cannon Firing Platform for FCS MGVs
The AFV ASSOCIATION was formed in 1964 to support the thoughts and research of all those interested in Armored Fighting Vehicles and related topics, such as AFV drawings. The emphasis has always been on sharing information and communicating with other members of similar interests; e.g. German armor, Japanese AFVs, or whatever.
Post new topic    Reply to topic    Printer Friendly Page     Forum Index ›  AFV News Discussion Board

View previous topic :: View next topic  
Author Message
Neil_Baumgardner
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 3942
Location: Arlington, VA
PostPosted: Mon Oct 02, 2006 4:30 pm
Post subject: Army Takes Delivery of Cannon Firing Platform for FCS MGVs



Army Takes Delivery of Cannon Firing Platform for FCS Manned Ground Vehicles
US Army: issued Sept. 29, 2006

The NLOS Cannon Firing Platform, which features a 38-caliber, fully automated 155-mm howitzer, will be used to develop prototypes for the Future Combat Systems (FCS) program. (BAE Systems photo)WASHINGTON --- The Army today took delivery of the firing platform for a new cannon artillery system that will reduce battlefield risk to Soldiers, while meeting an essential Army modernization requirement.

The firing platform was unveiled at BAE Systems’ Land and Armaments division in Minneapolis and will be transferred this month to Yuma Proving Ground in Arizona for field testing. The firing platform is part of the Army’s new Future Combat Systems Non-Line-of-Sight-Cannon artillery system.

“The Army’s future force is fast becoming a reality today,� said Maj. Gen. Charles Cartwright, Future Combat Systems program manager. “This latest piece of hardware is tangible proof that FCS technologies are maturing on schedule, in accordance with Army plans and expectations. The true beneficiaries of these new capabilities will be our Soldiers.�

Future Combat Systems is the Army’s primary modernization program, and is the Army’s first major modernization in almost four decades. Future Combat Systems will provide Soldiers with near real-time situational awareness by using an advanced electronic network to integrate 18 new manned and unmanned air and ground systems. Future Combat Systems will increase the ability of Soldiers to handle the variety of missions they face every day, provide greater protection, and increase combat capabilities throughout the operational force.

Soldiers are already testing and fielding components of Future Combat Systems right now in Iraq and Afghanistan; and next year, Soldiers of the Evaluation Brigade Combat Team will begin testing FCS technologies and tactics at Fort Bliss, Texas. The plan calls for 15 Brigade Combat Teams with the full suite of Future Combat Systems; and all other Brigade Combat Teams having some Future Combat Systems capabilities.

The Non-Line-of-Sight-Cannon will give the Army a key capability that it currently lacks: a cannon artillery system that is fully automated, highly mobile, and capable of launching multiple rounds precisely on target simultaneously. Moreover, unlike the Army’s current artillery systems, the Non-Line-of-Sight-Cannon will be fully integrated into an advanced electronic network shared by Soldiers on the battlefield. This will make the Non-Line-of-Sight-Cannon much more responsive to Soldier mission requirements.

The Non-Line-of-Sight-Cannon also will help to minimize Soldier risk; because it will be much more mobile and deployable than the Army’s current-day artillery systems, which employ 1960s-era design technology. Reducing risk is a huge dividend of Future Combat Systems technology overall. Providing Soldiers with near real time situational awareness before they encounter potentially risky or deadly situations will save Soldiers lives. An Unmanned Aerial Vehicle will identify for Soldiers if there’s a sniper in the next alleyway or cavern. An Unmanned Ground Vehicle will help to dispose of an IED or roadside bomb.

The firing platform unveiled today will lead to delivery of early Non-Line-of-Sight-Cannon prototypes in 2008. The early prototype Non-Line-of-Sight-Cannon is the first of eight Future Combat Systems Manned Ground Vehicles.

The Future Combat Systems Manned Ground Vehicles will have 75-80 percent commonality stemming from a common chassis and other common components. These common components include a lightweight band track and a hybrid-electric propulsion system, which maximizes power and fuel efficiency. The Manned Ground Vehicles will be at least as survivable as current Army vehicles and, in most likely operational scenarios, considerably more survivable and capable than anything now in the Army’s inventory.

The Army already has fired more than 2,000 rounds from the Non-Line-of-Sight-Cannon System Demonstrator at Yuma. The firing platform unveiled today includes a cannon assembly that is 1,200 pounds lighter than the M777 cannon used on the Non-Line-of-Sight-Cannon Concept Technology Demonstrator.

“Technological advances are enabling our Army to achieve greater capabilities with less mass and weight,� Cartwright said. “Future Combat Systems is about making our Army more agile and more strategically deployable, while increasing lethality, survivability and tactical mobility. The Non-Line-of-Sight-Cannon is an integral part of our Army modernization efforts.� (ends)


BAE Systems Unveils NLOS Cannon Firing Platform; Event Marks Key Milestone for Future Combat Systems Program
BAE Systems: issued Sept. 29, 2006

MINNEAPOLIS --- BAE Systems today unveiled the Future Combat Systems (FCS) Non-Line-of-Sight (NLOS) Cannon Firing Platform.

The NLOS Cannon is the lead Manned Ground Vehicle (MGV) of the Boeing/Science Applications International Corporation (SAIC) led FCS Program. FCS, the U.S. Army's foremost modernization program, is an integrated family of air systems and both manned and unmanned ground systems connected by a robust network that is the U.S. Army's foremost modernization program. The 155-mm Firing Platform is the first step toward development of NLOS Cannon prototypes scheduled to begin testing in 2008.

"This is a significant event for the American soldier," said LTC Robert G. McVay. "The successful integration of this Firing Platform is a demonstration that the NLOS Cannon and the FCS MGV family are quickly becoming a reality."

The NLOS Cannon Firing Platform, which features a 38-caliber length, fully automated 155-mm howitzer, was developed at BAE Systems' Minneapolis System Integration Facility and will soon be shipped to Army test facilities, where it will begin qualification of its ultra-lightweight cannon and breech. The Firing Platform will undergo testing through 2008. Test data from these tests will support obtaining a safety release, which will allow soldiers to begin testing the NLOS Cannon prototypes.

"Operations in Iraq and Afghanistan have proved the critical importance of cannon artillery in defeating both conventional and insurgent-type threats," said Jim Unterseher, BAE Systems director of Army Programs. "The push-button firepower of the NLOS Cannon will give soldiers an even more lethal, flexible and responsive fire support option for ensuring mission success in a range of combat scenarios."

The Firing Platform's howitzer is integrated with a fully automated ammunition handling system. The platform, made of a combination of high-strength steel and aluminum, incorporates a cannon assembly that is 1,200 pounds lighter than the M777 cannon used on the NLOS Cannon Concept Technology Demonstrator previously developed and tested by BAE Systems.

The cannon assembly is integrated onto a lightweight surrogate chassis that provides performance similar to the full prototype vehicle chassis. The NLOS Cannon prototypes will incorporate lightweight band track, a two person crew station and a hybrid-electric propulsion system that maximizes power and fuel efficiency.

Much of the advanced technology being developed for the NLOS Cannon is being incorporated into the design and development of other vehicles in the MGV family, such as the NLOS Mortar. The NLOS Mortar is being designed by BAE Systems to have an estimated 80 percent commonality with the NLOS Cannon chassis and mission equipment to reduce maintenance and logistics. A NLOS Mortar Firing Platform is expected to be delivered for testing and qualification in spring 2007.

The FCS will improve the strategic deployability and operational maneuver capability of ground combat formations without sacrificing lethality or survivability. The Boeing Company is partnered with SAIC as the Lead Systems Integrator (LSI) for the program, with support from a vast network of "One Team" subcontractors and suppliers including BAE Systems.


Unveiling of Non-Line-of-Sight-Cannon Firing Platform Marks Major Step For Future Combat Systems Manned Ground Vehicle Fleet Development
Boeing Co.: issued Sept. 29, 2006

ST. LOUIS --- The Boeing Company and partner Science Applications International Corporation (SAIC), as the Lead Systems Integrator for the U.S. Army's Future Combat Systems (FCS) program, today celebrated the unveiling of the FCS Non-Line-of-Sight Cannon (NLOS-C) firing platform. The event, held at BAE Systems' Land and Armaments division in Minneapolis, is a significant step toward development of FCS NLOS-C early prototypes scheduled to begin testing in 2008 and the full family of FCS Manned Ground Vehicles (MGVs) in 2010.

"Today's unveiling is testament to the FCS best-of-industry approach and to the tremendous effort by the entire FCS manned ground vehicle team," said Dennis Muilenburg, Boeing vice president-general manager of Combat Systems and FCS program manager. "It represents another visible sign that FCS technologies are maturing on schedule, and that hardware and software development is on track as the program transitions into the design, build and test phase. The advanced technologies being developed on the NLOS-C firing platform and subsequent prototypes are paving the way for the entire family of FCS manned ground vehicles."

The NLOS-C firing platform, developed and integrated by BAE Systems' Land and Armaments division at its Minneapolis Systems Integration facility, comprises a sprung chassis and functional mission module, and features a 38-caliber length, fully automated 155-mm howitzer. It will soon be shipped to Army facilities where it will undergo testing through 2008 to provide early safety release and qualification of the ultra-lightweight cannon and breech. The NLOS-C will provide a networked, extended range precision attack capability against point and area targets in support of FCS Brigade Combat Teams.

Together with the Army and LSI, BAE Systems and General Dynamics Land Systems are developing the NLOS-C as the first vehicle in the FCS program's fleet of eight variants of manned ground vehicles. These vehicles will maximize the use of common chassis, parts and sub-systems. They will feature a two-person crew station, lightweight band track, and a hybrid-electric propulsion system that maximizes power and fuel efficiency. Overall, FCS manned ground vehicles will require 10-30% less fuel and far fewer mechanics than current manned ground vehicles.

The eight MGV variants, including the NLOS-C, are among the 18 networked systems that together will constitute FCS, the U.S. Army's foremost modernization program. Currently in the System Development and Demonstration phase, FCS is being accelerated to meet near-term needs of the current force while equipping future warfighters with advanced capabilities to meet emerging threats. FCS will improve the strategic deployability and operational maneuver capability of ground combat formations without sacrificing lethality or survivability.
Back to top
View user's profile
SFC_Jeff_Button
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 1311
Location: Ft Hood, TX
PostPosted: Tue Oct 03, 2006 12:54 am
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

Niel, was there a cost listed with these, per system? I have a feeling it will be a long time before these are fielded. Since funds are being cut left and right here at Ft Hood, ie: soldiers are cutting acres of grass with push mowers because funds were cut for the civilians with tractors and gang mowers. I can hardly schedule training for my troops around "area beautification" (what they call cutting grass in the units area) because my guys have to cut grass Monday, Wednesday, and Thursday's from 9 Oct-28 Oct. Yet they want to field a new system, when they cant even get parts to maintain properly the older and proven systems. OK, I vented, it was a crappy day as usual here and I had to just say that. I'll be quite now.

_________________
SFC Jeff Button "High Angle Hell"
Back to top
View user's profile Send e-mail Photo Gallery
Neil_Baumgardner
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 3942
Location: Arlington, VA
PostPosted: Tue Oct 03, 2006 10:16 am
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

Keep in mind those funds you are talking about come out of different pools (ie different "colors of money."). Training, base support, etc that all comes out of Operations & Maintenance (O&M). Despite the supplementals, O&M funding is under pressure due to the war in Iraq. FCS and other programs come out of R&D and eventually procurement funding.

Neil
Back to top
View user's profile
Roy_A_Lingle
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 1997
Location: El Paso & Ft Bliss, Texas
PostPosted: Wed Oct 04, 2006 1:34 pm
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

Hi Jeff! Hi Folks!

- SFC_Jeff_Button

I have a feeling it will be a long time before these are fielded.


It will take some time, that Firing Platfrom is only a developement item. The item that may get fielded will be based on that carrier. As I understand it, the NLOS vehicle is being pushed (more money) so it can replace the cancelled Cruasder program.

Here at Ft. Bliss where the first FCS Brigade is scheduled to stand up next year the word going around is there are no funds. Funds needed to repair enough Abrams and Bradleys for them to start testing the FCS command, control, and communtions equipment that the FCS vehicles will be using.

- SFC_Jeff_Button

OK, I vented, it was a crappy day as usual here and I had to just say that.


Sounds a lot like my days back when Jimmy Carter was Commander in Chief. He cut funding for DOD way back. Units I was in did a lot of "area beautification" missions and sweeping the dust off the motor pools because there was no funds for much of anything else. At the end of one FTX, we drained fuel out of dead lined vehicles so the few that were still running could conduct annual gunney training because the 3rd ACR had run out of training funds to buy fuel with.

Maintaining morale will be a problem, the challege will be finding ways to keep it up. Good Luck.
Sgt, Scouts Out!

_________________
"You can never have too much reconnaissance."
General G.S. Patton Jr.
Back to top
View user's profile Send e-mail
bsmart
Power User

Offline Offline
Joined: Jan 23, 2006
Posts: 2523
Location: Central Maryland
PostPosted: Wed Oct 04, 2006 3:33 pm
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

- Roy_A_Lingle
Hi Jeff! Hi Folks!

Sounds a lot like my days back when Jimmy Carter was Commander in Chief. He cut funding for DOD way back. Units I was in did a lot of "area beautification" missions and sweeping the dust off the motor pools because there was no funds for much of anything else. At the end of one FTX, we drained fuel out of dead lined vehicles so the few that were still running could conduct annual gunney training because the 3rd ACR had run out of training funds to buy fuel with.

Maintaining morale will be a problem, the challege will be finding ways to keep it up. Good Luck.
Sgt, Scouts Out!


I remember those days Mad Inflation running at 15%+ and he decided we would only get a 3% raise 'to set an example for the country' Some example my rent went up 15% the same day. At one point I was the only person below E-5 in my shop of 40+ people who was NOT getting foodstamps. The commander actually called me and my shop chief into his office to make sure I knew that they were available. He was launching into a spiel about how it wasn't charity when my shop chief interrupted. 'Sir Airman Smart is something of a special case. His wife has a masters degree in Special Ed and teaches full time'

And cold weather gear that was backordered so they couldn't issue long johns, field jacket liners, or gloves to us when we were working on the flightline. At one point we couldn't get steel toed shoes in most sizes. That almost cost me a big toe, luckily the tanker bar only grazed it and although I lost a nail it grew back. When they took me to the clinic that night the Dr wanted to write me up for not wearing proper safety equipment. I pulled the backorder slip out of my pocket and said 'No sir these are my safety shoes right here!.' He almost went ballistic.

Yea the Carter years and 'zero based budgeting' was no fun. I hope it doesn't get that bad again

_________________
Bob Smart ([email protected])
Back to top
View user's profile Send e-mail
Roy_A_Lingle
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 1997
Location: El Paso & Ft Bliss, Texas
PostPosted: Thu Oct 05, 2006 1:32 am
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MG

Hi Folks!

Follow up to my post on when the FCS cannon system will be deployed.
Per the October issue of Army Magazine (just received today) page 378.

"Designed by BAE Systems, the NLOS-C is the lead manned ground vehicle of the Army's FCS program. The development schedule calls for the first NLOS-C Increment 0 prototypes to be delivered in 2008 for testing....."

I take that to mean, the NLOS-C will be the first manned vehicle out the factory doors.

On page 379 it reports the following: "The NLOS-C firing platform, an early test asset for the common misson equipment....."

The first step was the NLOS-C Concept Technology Demonstartor which fired 2,000 rounds at Yuma Proving Grounds.

The NLOS-C firing platform test asset is step two.

The Increment 0 prototypes, step three, may look something like the turreted drawings the Army has over at it's public web site.

www.army.mil

Something I think is a bit odd about the NLOS-C and the NLOS-M is the NLOS-C will have an auto loading cannon with a crew of two. The NLOS-M will have a semi-auto mortar with a crew of four.

Spot Report!
Sgt, Scouts out! Smile

Note: NLOS-C = Non-Line of Sight - Cannon
NLOS-M = Non-Line of Sight - Mortar

_________________
"You can never have too much reconnaissance."
General G.S. Patton Jr.
Back to top
View user's profile Send e-mail
KenEstes
Power User

Offline Offline
Joined: Feb 07, 2006
Posts: 10

PostPosted: Thu Oct 05, 2006 1:57 pm
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

Jimmy as the prez was only continuing the Hollow Force of the 70s, brought to us by the end of the Nixon [Mel Laird SecDef] term and the Ford [Rummie SecDef in v1.0]. Tanks on Okinawa in 1975 were rationed to 50 gal/mon of DF-2. Defense spending under Carter went up, especially in the second half. But anyway, the black hole that comes after this war is over will dwarf that one and it will be a real horror show.

I thought the pic was of the demonstrator, I sure would not like to take an unarmored gun into action! But the Ft Lewis people say they are going to be receiving their first deliveries soon, so something is being shipped to them.
Back to top
View user's profile
Neil_Baumgardner
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 3942
Location: Arlington, VA
PostPosted: Thu Oct 05, 2006 2:55 pm
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

Re: Fort Lewis, you're probably thinking of the Stryker MGS they have started receiving...

Neil
Back to top
View user's profile
Roy_A_Lingle
Power User

Offline Offline
Joined: Jan 24, 2006
Posts: 1997
Location: El Paso & Ft Bliss, Texas
PostPosted: Thu Oct 05, 2006 3:37 pm
Post subject: Re: Army Takes Delivery of Cannon Firing Platform for FCS MGVs

Hi Ken! Hi Folks!

- KenEstes

....the black hole that comes after this war is over will dwarf that one and it will be a real horror show.


I agree with that.

- KenEstes

I thought the pic was of the demonstrator, I sure would not like to take an unarmored gun into action!


I think 'demostrator' was the contracter name for that vehicle. The 'Cannon Firing Platform' is the Army's name for the SAME VEHICLE with some upgrades that were done after the test firing was completed and problems were i.d.ed

Per the October issue of Army magazine, the firing platform will be going to Yuma for testing. I guess the 2,000 rounds of test firing done last year was by the contactor. Now that the Army owns it, my guess is the Army will now do more testing. As for unarmored, the drawings show a turret covering the automatic workings of that modified M777 howitzer. The crew is only two men, positioned down in the lighty armored hull. My guess is that two men are not going to be able to operate that system if any of the auto loading equipment fails.

Sgt, Scouts Out!

_________________
"You can never have too much reconnaissance."
General G.S. Patton Jr.
Back to top
View user's profile Send e-mail
Display posts from previous:   
Post new topic    Reply to topic    Printer Friendly Page    Forum Index ›  AFV News Discussion Board
Page 1 of 1
All times are GMT - 6 Hours



Jump to:  


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum
You cannot attach files in this forum
You cannot download files in this forum